Raw Material and Process
|
|
Raw Material
|
Available
|
Needed
|
UOM
|
Unit Cost
|
per
|
Total
|
%
|
MS51981-40 - 10-24 x 1/2 Alloy Steel, Hex Socket, Oval Point, Cad Yellow Plated Set Screw per MS51981 Rev C and AN565F10H8 Rev 7
(Consumed in Step #2 - 60 Inspection)
|
|
8,790
|
10,000
|
EA
|
|
EA
|
|
|
|
|
Step #
1
-
SCREW Screw Machine
-
Setup Cost
|
|
|
4.00
|
Hours
|
15.00
|
Hour
|
60.00
|
21.46
|
|
|
Step #
1
-
SCREW Screw Machine
-
Machine Cost
|
|
|
6.11
|
Hours
|
10.00
|
Hour
|
61.10
|
21.85
|
|
|
Step #
4
-
60 Inspection
-
Labor Cost
|
|
|
4.00
|
Hours
|
20.00
|
Hour
|
80.00
|
28.61
|
|
|
41L40-.1625 - .162 - .163 41L40 Alloy 12' Rd Bars per Cam-Tech Spec CT41L40. 105,000 PSI Max. Original Mill Cert Required.
(Consumed in Step #1 - SCREW Screw Machine)
|
|
6,648.34
|
23.92
|
LB
|
164.44
|
CTW
|
39.33
|
14.06
|
|
|
/CY - Cad Plate Type II Class 2 QQ-P-416 Rev. B. Baking to start within 4 hours after plating for a minimum of 23 hour at 375 +/-25. Cert. Req'd
(Consumed in Step #3 - 50 Plating)
|
|
Expense
|
23.92
|
LB
|
2.6836
|
LB
|
64.19
|
22.95
|
|
|
/HEATTREAT41L40 - Heat Treat Steel 41L40 to Rc 46-53
(Consumed in Step #2 - 30 Heat Treating)
|
|
Expense
|
23.92
|
LB
|
2.2990
|
LB
|
54.99
|
19.66
|
|
Gantt Chart
|
|
Activity
|
06-15-06
|
06-23-06
|
07-02-06
|
07-10-06
|
|
PROCESS SETUP LEAD TIME
MS51981-40
-
10-24 x 1/2 Alloy Steel, Hex Socket, Oval Point, Cad Yellow Plated Set Screw per MS51981 Rev C and AN565F10H8 Rev 7
|
|
Ending:
Fr 06-09-06 08:48am
|
|
PROCESS SETUP
MS51981-40
-
10-24 x 1/2 Alloy Steel, Hex Socket, Oval Point, Cad Yellow Plated Set Screw per MS51981 Rev C and AN565F10H8 Rev 7
|
|
Ending:
Fr 06-09-06 12:48pm
|
|
PROCESS RUN
MS51981-40
-
10-24 x 1/2 Alloy Steel, Hex Socket, Oval Point, Cad Yellow Plated Set Screw per MS51981 Rev C and AN565F10H8 Rev 7
|
|
Ending:
Mo 06-12-06 10:55am
|
|
WAIT FOR SHIPPING
Rochester Steel Treating Works, Inc.
/HEATTREAT41L40
-
Heat Treat Steel 41L40 to Rc 46-53
|
|
Ending:
Mo 06-12-06 3:00pm
|
|
OUTSIDE PROCESS
Rochester Steel Treating Works, Inc.
/HEATTREAT41L40
-
Heat Treat Steel 41L40 to Rc 46-53
|
|
Ending:
Mo 06-26-06 3:00pm
|
|
PROCESS SETUP WAIT TIME
MS51981-40
-
10-24 x 1/2 Alloy Steel, Hex Socket, Oval Point, Cad Yellow Plated Set Screw per MS51981 Rev C and AN565F10H8 Rev 7
|
|
Ending:
Mo 06-26-06 9:00pm
|
|
WAIT FOR SHIPPING
Keystone Corporation
/CY
-
Cad Plate Type II Class 2 QQ-P-416 Rev. B. Baking to start within 4 hours after plating for a minimum of 23 hour at 375 +/-25. Cert. Req'd
|
|
Ending:
Tu 06-27-06 3:00pm
|
|
OUTSIDE PROCESS
Keystone Corporation
/CY
-
Cad Plate Type II Class 2 QQ-P-416 Rev. B. Baking to start within 4 hours after plating for a minimum of 23 hour at 375 +/-25. Cert. Req'd
|
|
Ending:
Mo 07-17-06 3:00pm
|
|
PROCESS LABOR TIME
MS51981-40
-
10-24 x 1/2 Alloy Steel, Hex Socket, Oval Point, Cad Yellow Plated Set Screw per MS51981 Rev C and AN565F10H8 Rev 7
|
|
Ending:
Tu 07-18-06 11:00am
|
|
WAIT FOR SHIPPING
MS51981-40
-
10-24 x 1/2 Alloy Steel, Hex Socket, Oval Point, Cad Yellow Plated Set Screw per MS51981 Rev C and AN565F10H8 Rev 7
|
|
Ending:
Tu 07-18-06 3:00pm
|
|